This operation took 12 hours and 700 cables with powerful jacks to complete. The giant, 227-meter-long and 45-meter-tall, steel arch will take another three weeks to fully install.
Road traffic along the Crimea Bridge, the longest in Russia, is scheduled to commence in December.